This 3-phase metered PDU is perfect for enterprise data centers, high-density server environments, and IT professionals requiring robust 11.5kW power distribution with comprehensive monitoring capabilities. The Tripp Lite PDU3XMV6G20 delivers:
-
11.5kW power capacity supporting high-density server and network equipment loads
-
Metered power distribution unit functionality providing real-time power consumption monitoring
-
C13 and C19 outlets configuration accommodating diverse server power requirements
-
Vertical 0U design maximizing rack space efficiency for data center optimization
Key Features
-
3-phase power distribution unit with 11.5kW capacity for enterprise deployments
-
Local metering technology for comprehensive power monitoring and management
- 36 C13 outlets supporting standard server and equipment power connections
- 9 C19 outlets accommodating high-power devices and dense server loads
-
Vertical 0U mounting optimizing valuable rack space in data center environments
- IEC-309 16/20A Red input connector with 6-foot cord for flexible installation
- TAA compliant for government and enterprise procurement requirements
Technical Specifications
| Manufacturer |
Tripp Lite by Eaton |
| Model Number |
PDU3XMV6G20 |
| Type |
3-Phase Metered PDU |
| Power Capacity |
11.5kW maximum |
| Phase Configuration |
3-Phase power distribution |
| Output Voltage |
208-240V |
| Input Voltage |
360-415V |
| Input Connector |
IEC-309 16/20A Red |
| C13 Outlets |
36 receptacles |
| C19 Outlets |
9 receptacles |
| Cord Length |
6 feet (1.83 meters) |
| Mounting Type |
Vertical 0U rack mount |
| Monitoring |
Local metering with power consumption display |
| Compliance |
TAA (Trade Agreements Act) compliant |
| Compatible Equipment |
High-density servers, storage arrays, network switches, enterprise hardware |
| Environment |
Enterprise data center, colocation, cloud infrastructure |
Frequently Asked Questions
Q: What makes 3-phase power distribution ideal for high-density data centers?
A: This 3-phase power distribution unit provides superior power efficiency and load balancing with 11.5kW capacity, enabling higher equipment density while reducing electrical infrastructure costs compared to single-phase solutions.
Q: How do the C13 and C19 outlet combinations benefit server deployments?
A: The 36 C13 outlets support standard servers and network equipment, while 9 C19 outlets accommodate high-power servers and storage systems, providing flexibility for mixed equipment environments.
Q: What monitoring capabilities does this metered PDU provide?
A: This metered power distribution unit features local power consumption monitoring, enabling real-time visibility into power usage for capacity planning, energy management, and billing applications.
Q: Is the vertical 0U design suitable for space-constrained racks?
A: Yes, the vertical 0U mounting design installs along the rear or sides of the rack without consuming valuable rack units, maximizing space for servers while providing robust power distribution.
Tripp Lite 3-phase metered PDU 11.5kW with 36 C13 and 9 C19 outlets. Vertical 0U design for enterprise data center power distribution.